PROJECTS
Renewable energy Projects
renewable energy projects we have completed

40.6MWp PV PLANT
Mocoba, Mozambique
Scope of Work:
- Mechanical Installation of Single-Axis Tracker
- E & I Supply and Installation of:
- Cabling – MV, LV and DC
- Inverters, RMU and Switching Station
- Lightning Protection System
- Engineering Design, Supply & Commissioning of Security System
- Fibre Installation, Splicing & Commissioning
- Complete installation QA/QC, HR & SHE compliance management
Details:
Peak Manpower:
600
Owner:
Scatec Solar
Location:
Mocoba, Mozambique
Contractor:
Lead Engineering and Projects
Duration / Finish:
Sep 2018 - Feb 2019
Equipment:
- PV Modules – 123070 x 330Wp 72cell polycrystalline, R/SEN/RSM.
- Inverters – 9 x 3,775MWac (Inverters are GPTECH / 3775WD3-HV620).
- Substructure – PVH Single Axis Tracker AXONE 60
- Secondary Switchgear – 9 x 33kV (Schneider Electrical)
- Grid Connection – 2 x 33kV ACTOM Switchboard
10MWp PV PLANT
Tororo, Uganda
Scope of Work:
- Complete Engineering, including:
- Civil – roads, security fencing, substructure & buildings
- Electrical – Security System, Inverters, MV reticulation, Grid Connection Study, Protection Grading & SCADA Interface
- Procurement, Supply & Installation/ Construction of:
- Civil – Ground clearing, roads, security fencing and buildings
- Substructure – Pia Fix Tilt Ground Mounted PV substructure
- Electrical – PV modules, Inverters, Security System, SCADA Interface, MV reticulation, Grid Connection
- Fibre Installation, Splicing & Commissioning
- Complete installation QA/QC, HR & SHE compliance management
Details:
Peak Manpower:
250
Location:
Torroro, Uganda
Contractor:
Lead Engineering and Projects
Duration / Finish:
Jan – Aug 2017
Equipment:
- PV Modules – 3096 x 315Wp 72cell polycrystalline BYD Solar Modules
- Inverters – 8 x 1070kWp INGECON (Inverters are SUN PowerMax range)
- Secondary Switchgear – 4 x 33kV (Normafix 36 Switchgear from efacec)
- Grid Connection – 1 x 33kV ABB switchboard (Extension to UTCL Board)


ADDAX BIOENERGY PLANT
Makeni, Sierra Leone
Scope of Work:
- Construction/Installation of electrical equipment including:
- Cable Supports
- Cabling – MV, LV, network and Instrumentation
- Electrical cabinets
- Construction/Installation of Instrumentation
- Plant Lighting
- Plant commissioning assistance
- Installation Quality Control
- Site health, safety and environmental compliance
Details:
Peak Manpower:
29
Location:
Makeni, Sierra Leone, West Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
4 Months / Feb – May 2014
419.27kWp ROOFTOP PV PLANT
Netcare Alberlito
Scope of Work:
- Supply, design and installation
- Integration with monitoring system
- Lightweight and high quality rooftop substructure
- Installation Quality Control
- Site health, safety and environmental compliance
Details:
Peak Manpower:
20
Location:
Ballito, Kwa-Zulu Natal, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
3 Months / 22 February 2016


JASPER 75MWp PV PLANT
Postmasburg, South Africa
Scope of Work:
- Construction / Installation of free-issued PV equipment
- Electrical installation according to SANS 10142 standard
- Test and commissioning of individual sub plants
- Test integrity of all DC cables installed
- Electrical Installation Quality Control
- Mechanical Quality Control of all sub plants
- Site health, safety and environmental compliance
Details:
Peak Manpower:
60
Location:
Postmasburg, Northern Cape, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
6 Months / Feb – Aug 2014
This Project forms part of the Renewable Energy IPP Program. Jasper is a PV project which will produce 75MW once connected to the Eskom grid. Jasper PV Plant is the first renewable Energy Project that was funded by Google.
100MW CSP PLANT
!KaXu Solar One
Scope of Work:
- Cable tray and support installation
- Cable installation (Power and Instrumentation)
- Cable termination
- Instrumentation calibration & installation
- Electrical Cabinet and Instrumentation Junction Box mounting and installation
- Provision of Commissioning support to Abeinsa EPC, the main project contractor
Details:
Peak Manpower:
134
Location:
Pofadder, Northern Cape, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
11 Months / Sep 2013 – Aug 2014
The !Kaxu Solar One project is a Concentrated Solar Power Plant of 100MW with 4 hour thermal storage. This Project forms part of the REIPPP Bidding round 1 of approved renewable energy projects.


100MW CSP PLANT
!KaXu Solar One
Scope of Work:
- Basic & Detailed Engineering:
- MCC
- PLC
- HMI
- Instrumentation
- Field Junction Boxes
- Site Lighting & Earthing
- Software Development
- Siemens S7 TIA Portal
- Procurement
- Construction
- Commissioning
Details:
Peak Manpower:
20
Location:
Pofadder, Northern Cape, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
3 Months / Sep – Nov 2013
This Project forms part of the Renewable Energy IPP Program. !KaXu is a CSP project which will produce 100MW once connected to the grid.
100MW CSP PLANT
!KaXu Solar One
Scope of Work:
- The scope of work entrusted to LeadEPC included the E&I on the following subsystems of the !KaXu CSP Project:
- SSG (Solar – Steam Generator)
- TES (Thermal Energy Storage)
- ACC (Auxiliary Cooling Condenser)
- Turbine (Turbine Generator System)
- Solar Field installations
- Instrumentation systems for the SSG, TES, ACC and Turbine systems
Details:
Peak Manpower:
12
Location:
Langlaagte, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
6 Weeks / Nov’ - Dec’ 2013
The Heat Tracing system forms a very important part of the thermal cycle, because it is used to ensure that the Heat Transfer Fluid (HTF) temperature does not drop below the recommended operational values. LeadEPC also performed the Power and Control cable, the cable tray, support structure installation and the field and cabinet termination of the Heat Tracing cables.


22.36MWp PV PLANT
Clark, Philippines
Scope of Work:
- Construction of the complete plant:
- Site Levelling & Ballast Foundations
- Substructure and PV Module Installation
- AC & DC Cabling
- Switchyard Civils, Foundations and Erections
- Control Room Erection and Setup
- Commissioning & Handover Process
- Construction Management Team comprising of:
- Project Manager
- Electrical Site Managers (2)
- QA Manager
- Safety Manager
- Local team involvement:
- Community Relation Officer
- Admin and HR Officer
- Civil Construction Supervisors (2)
- Safety Officer
Details:
Peak Manpower:
692
Location:
Clark, Philippines
Contractor:
Lead Engineering and Projects
Duration / Finish:
6 Months / Sep 2015 – Mar 2016
419.27kWp ROOFTOP PV PLANT
Netcare Olivedale
Scope of Work:
- Supply, design and installation
- Integration with monitoring system
- Lightweight and high quality rooftop substructure
- Installation Quality Control
- Site health, safety and environmental compliance
Details:
Peak Manpower:
30
Location:
Olivedale, Johannesburg, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
2 Months / 15 December 2015


289.85kWp ROOFTOP PV PLANT
Elandsfontein, South Africa
Scope of Work:
- Integration with monitoring system
- Lightweight and high quality rooftop substructure
- Installation Quality Control
- Site health, safety and environmental compliance
Details:
Peak Manpower:
15
Location:
Elandsfontein, Johannesburg, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
2 months / September 2016
Equipment:
- PV Modules – 935 x 310Wp 70 cell polycrystalline Trina Solar Modules
- Inverters – 25kW STP SMA (Inverters are SMA Tripower range)
- Substructure – LeadEPC Steel Structure
10MW - PV PLANT
Bufulubi, Jenja, Uganda
Scope of Work:
- 10MWp Single Axis Tracker PV System
- Design, supply and construction for civil works
- Ground Clearing, Roads, Fencing, Stormwater etc
- O&M Building
- Inverter Bases
- Construction of ground mounted substructure.
- Installation of AC and DC cabling
- Installation of MV cabling
- Installation of security system
- Fiber Installation, splicing and commissioning
- Installation Quality Control for entire project
- Site health, safety and environmental compliance
Details:
Peak Manpower:
500
Location:
Bufulubi, Jenja, Uganda
Contractor:
Lead Engineering and Projects
Duration / Finish:
Jul 2018 - Jan 2019


970.24kWp ROOFTOP PV
Netcare Pretoria East
Scope of Work:
- Supply, design and installation
- Integration with monitoring system
- Lightweight, high quality rooftop substructure
- Installation Quality Control
- Site health, safety and environmental compliance
Details:
Peak Manpower:
28
Location:
Elandsfontein, Johannesburg, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
6 Months / Apr – Oct 2016
Equipment:
- PV Modules – 3096 x 315Wp 72 cell polycrystalline Jinko Solar Modules
- Inverters – 20 and 25kW STP SMA (Inverters are SMA Tripower range)
- Substructure – LeadEPC Roof Bracket combined with PowArSnap® anti-theft module clips
190.4kWp ROOFTOP PV PLANT
Netcare Kroonstad
Scope of Work:
- Supply, design and installation
- Integration with monitoring system
- Lightweight, high quality rooftop substructure
- Installation Quality Control
- Site health, safety and environmental compliance
Details:
Peak Manpower:
20
Location:
Kroonstad, Freestate, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
2 Months / May 2017
Equipment:
• PV Modules – 595 x 320Wp 72 cell polycrystalline Jinko Solar Modules
• Inverters – 25kW STP SMA (Inverters are SMA range)
• Substructure – Valsa Aluminium Structure


135.04kWp ROOFTOP PV PLANT
Netcare Krugersdorp
Scope of Work:
- Supply, design and installation
- Integration with monitoring system
- Lightweight, high quality rooftop substructure
- Installation Quality Control
- Site health, safety and environmental compliance
Details:
Peak Manpower:
20
Location:
Krugersdorp, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
2 Months / May 2017
Equipment:
- PV Modules – 422 x 320Wp 72 cell polycrystalline Jinko Solar Modules
- Inverters – 25kW STP SMA (Inverters are SMA range)
- Substructure – Valsa Aluminium Structure
231.8kWp CARPORT PV PLANT
Netcare Pholoso
Scope of Work:
- Supply, design and installation
- Integration with monitoring system
- Lightweight, high quality rooftop substructure
- Installation Quality Control
- Site health, safety and environmental compliance
Details:
Peak Manpower:
30
Location:
Polokwane, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
3 Months / September 2017
Equipment:
- PV Modules – 422 x 320Wp 72 cell polycrystalline Jinko Solar Modules
- Inverters – 25kW STP SMA (Inverters are SMA range)
- Substructure – Valsa Aluminium Structure


60.8kWp ROOFTOP PV PLANT
Mustek – Midrand, South Africa
Scope of Work:
- Supply, design and installation
- Integration with monitoring system
- Lightweight, high quality rooftop substructure
- Installation Quality Control
- Site health, safety and environmental compliance
Details:
Peak Manpower:
20
Location:
Midrand, Johannesburg, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
3 Weeks / February 2018
Equipment:
- PV Modules – 265Wp 60 cell poly-crystalline Jinko Solar Modules
- Inverters – 8kW STP SMA (Inverters are SMA range)
- Substructure – Valsa Aluminium Structure