PROJECTS
sasol Projects
projects we have completed for sasol limited

U03B PLC REPLACEMENT
Secunda, South Africa
Scope of Work:
- Detailed engineering package.
- Design, supply & installation of:
- Siemens PCS 7 equipment.
- Control cabinets for 10 substations.
- Intermediate junction boxes for 10 substations
- Server cabinet
- Profibus and fibre optic network
- Supply, install and terminate cables for 10 substations
- Siemens PCS 7 software development +- 800 I/O
- Commissioning of Siemens PCS 7 system
- Hot-swop over from existing control system without a shutdown
- Complete installation QA/QC, HR & SHE compliance management
Details:
Peak Manpower:
35
Location:
Secunda, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
9 Months / Jan - Oct 2017
COMMERCIAL FIRE & GAS DETECTION
Secunda, South Africa
Scope of Work:
- • Detailed engineering package, construction and commissioning
- • Design, supply, install and commission Fire & Gas detection equipment to SANS 10139 standard and integrate into BMS system, HVAC system and fire doors control
• Supply and install the Autotronix BMS system and design interfacing to existing PA system, new Daikin HVAC system, new HMI system and emergency push-button at reception
Details:
Peak Manpower:
10
Location:
South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
13 Months / May 2019


PP2 K-TRON REPLACEMENT
Secunda, South Africa
Scope of Work:
- Detailed engineering package, construction and commissioning
- Design, supply, configuration and installation of new Coperian K-TRON system at PP2
- Design, supply and installation of remote control unit (KSU II) in EX rated enclosure
- Interface with Honeywell DCS and HMI system
Details:
Peak Manpower:
35
Location:
Secunda, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
9 Months / February 2019
TG PRESSURE BALANCE COMPENSATOR
Secunda, South Africa
Scope of Work:
- Install:
- 5 Tier ABB MCP at both Train 15 and Train 16 Oxygen plant
- New electrical cables from 525 to 6,6kVA
- New electrical cables to devices
- COC
- QC sign-off
- Final handover to Client
Details:
Peak Manpower:
5
Location:
Secunda, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
1 Months / April 2019


U052/252 SURGE PROTECTION
Secunda, South Africa
Scope of Work:
- Detail Engineering pack for:
- Process
- Mechanical & Piping
- Structural & Civil
- Electrical
- Control & Instrumentation
- Interface to Anti Surge Control panel
- Tender for Procurement & Construction to follow
- Manage subcontractors
Details:
Peak Manpower:
55
Location:
Secunda, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
24 Months / October 2020
VARIOUS SMALL PROJECTS
Secunda, South Africa
Scope of Work:
- Detailed design packages for electrical retrofit on MCC buckets
- Design packages aligned to Synfuels Electrical Forum
- Manage subcontractor for construction and commissioning
- COC
- QC sign-off
Details:
Peak Manpower:
6
Location:
Secunda, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
9 Months / November 2018


REWIRING MARSHALLING CABINETS
Secunda, South Africa
Scope of Work:
- Re-wiring of Honeywell DCS and ESD Marshalling cabinets to Sasol specifications
Details:
Peak Manpower:
6
Location:
Secunda, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
4 Months / October 2018
COMPLIANCE OF BUILDING
HH-BD-09
Secunda, South Africa
Scope of Work:
- As-building, detailed engineering package
- Replace generator feed with transformer feed from upstream substation
- Design, procurement, installation and commissioning of 380V CFS unit to reduce the fault level <10kA
- Design, procurement, installation and commissioning of four 380V distribution boards
- Reconfigurations of small power circuits and lighting, including cabling and racking
- Earthing of all equipment
Details:
Peak Manpower:
15
Location:
Secunda, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
2 Months / August 2019


COMPLIANCE OF AN & EXPLOSIVES PUMPS
Secunda, South Africa
Scope of Work:
- Process, Electrical, C&I and Mechanical Basic Engineering
- Compliance Audit in comparison to SHE-N03 code
- GAP Analysis to highlight deviations
- Detailing of proposed solution
- Preliminary design drawings for solutions
Details:
Peak Manpower:
3
Location:
Secunda, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
6 Months / Ongoing
POWER SUPPLY UPGRADE
Secunda, South Africa
Scope of Work:
- Detailed Electrical Engineering
- Detailed Civil Engineering of a transformer bay
- Design, Manufacture and installation of a 200kVA 525/400V Transformer
- Design, Refurbishment of a Allan-West MCC Tier
- New 400V Distribution board for the Fire Station Cafeteria equipment
- Network Analysis in ETAP
Details:
Peak Manpower:
12
Location:
Secunda, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
7 Months / Ongoing


LIFTING STATIONS ENGINEERING
Secunda, South Africa
Scope of Work:
- Detail Engineering Package
- Develop Design Philosophies
- Earthing
- Power and Control Cables
- Maintenance
- Construction
- Tie-in
- Network Analysis to verify expected fault level for new MCC’s
- Update Schematic drawings
- Develop New Schematic drawings
- Develop New Connection Diagram
- New Earthing Design for both North and South Lifting Stations
- Investigation on the suitability of installing the proposed MCC based on the fault level
Details:
Peak Manpower:
3
Location:
Secunda, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
2 Months / February 2019
CHLORIDE TREATER STRUCTURES
Secunda, South Africa
Scope of Work:
- Detailed Electrical Engineering & Design
- Electrical design input into 3D model
- Luminance level Simulation and Report
- Lighting Layout and Design
- Cable Routing
- Earthing and Bonding Design
- As-building of existing distribution board
- Updating of HAC drawings as per HAM specification
Details:
Peak Manpower:
3
Location:
Sasolburg, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
3 Months / March 2019


CTF WEST UNIT 96 DEMOLITION FILTERS 7 8 9
Secunda, South Africa
Scope of Work:
- Electrical, Control & Instrumentation work packages for the demolition works of Filter 7,8 and 9 in Unit 96
- Lists of existing equipment within the demolition area
- Demolition and Removal Philosophies per equipment type
- Isolation Philosophies
- Mark-up Existing drawings showing equipment to be removed
- Develop a SDE and Project Schedule for the execution of the demolition work
Details:
Peak Manpower:
3
Location:
Secunda, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
2 Months / November 2018
NPN SWITCHGEAR REPLACEMENT
Secunda, South Africa
Scope of Work:
- Basic Engineering Package
- As-building of current MCC installation and cable schedule development
- Basic Design for the replacement of Old OTTERMIL MCC with new switchgear
- Busbar design and selection
- Development of design philosophies
- Development of shutdown philosophies
- Heat loss calculations and HVAC selection
- Substation layout drawings
- Earthing and Bonding Design
- Works Information of the Detailed Engineering Phase
- ETAP Network Analysis
Details:
Peak Manpower:
3
Location:
Secunda, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
4 Months / October 2018


CTF WEST UNIT 96
Secunda, South Africa
Scope of Work:
- Electrical, Control and Instrumentation work packages for the demolition works of Filter 7,8 and 9 in Unit 96
- Lists of existing equipment within the demolition area
- Demolition and Removal Philosophies per equipment type
- Isolation Philosophies
- Mark-up Existing drawings showing equipment to be removed
- Develop a SDE and Project Schedule for the execution of the demolition work
Details:
Peak Manpower:
3
Location:
Secunda, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
2 Months / November 2018
SOLVENTS SPENT CATALYST STORE
Secunda, South Africa
Scope of Work:
- Electrical and Fire and Gas Design and Engineering
- Design Philosophies
- Cable installation and routing
- Power Cable Sizing
- Earthing and Lightning Protection
- Lighting and Small Power
- Transformer sizing
- Fire Alarm
- Luminance level Simulation and Report
- Technology Selection
- New 400V Distribution board design
Details:
Peak Manpower:
2
Location:
Secunda, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
2 Months / December 2018


SPI CONVERSION ENGINEERING
Secunda, South Africa
Scope of Work:
- C&I Engineering to convert existing design documents into SPI (INTOOLS)
- Generate Loop drawings
- Generate Termination Sheets
Details:
Peak Manpower:
3
Location:
Secunda, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
2 Months / June 2019
U003 / 203 EARTHING AND RACKING
Secunda, South Africa
Scope of Work:
- Findings assessment on Unit 003 Earthing System
- Detailed assessment of:
- the condition of the safety earth installation for both Unit 003 and 203
- the condition of the racking installation for both Unit 003 and 203
- Mark-up of existing drawings and As-built current installation
- Develop a findings register and prioritize findings for the execution phase
- Development of a BOQ to correct findings
- SDE for the execution works
Details:
Peak Manpower:
3
Location:
Secunda, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
2.5 Months / June 2019


F&G AND LSP AS BUILDING
Secunda, South Africa
Scope of Work:
- As-building of 25 Substations Fire and Gas equipment layout drawings
- As-build distribution boards feeding the Fire and Gas Equipment
- Update existing drawings and Draft new drawings
Details:
Peak Manpower:
4
Location:
Secunda, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
2 Months / June 2019
INSTALLATION OF HIGH VOLTAGE
Secunda, South Africa
Scope of Work:
- Manufacture & Install
- 2 Mechanical Structures on top of ESP roof
- Supply & Install:
- MCC
- 4 X 5 ton Electrical Hoists
- Power supply for Hoists
- Cable racking and Cables
- Install:
- 6 High Voltage Transformers
- 6 Corremax Controllers
- PLC Panel
Details:
Peak Manpower:
25
Location:
Secunda, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
9 Months / January 2019


UPGRADE OF FEEDING SYSTEM
Secunda, South Africa
Scope of Work:
- Supply and install
- Flow meters
- Heat Tracing system
- Cables and support
- Winterization for Heat tracing
Details:
Peak Manpower:
15
Location:
Secunda, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
12 Months / April 2019
DE-BOTTLENECK OF 20D POWER SUPPLY
Secunda, South Africa
Scope of Work:
- Supply & Install:
- MCC Panel
- Lighting Distribution Board
- Lighting Transformer
- Battery tripping unit
- Cable racking and Cables
- Building lights
- Bus-ducting system
- Build Transformer Pen
- Relocate LV Distribution Transformer
- Extend Sub-Station building
- QC and commissioning of the above
Details:
Peak Manpower:
25
Location:
Secunda, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
11 Months / May 2018


DAM SLUICE AUTOMATION
Secunda, South Africa
Scope of Work:
- Detailed engineering package, construction and commissioning
- Supply & Install:
- Transformer
- Distribution boards
- Instrumentation Panels
- Instrumentation
- Cable racking and Cables
- V-notch plates
- Actuators
- DCS/SCADA programming
Details:
Peak Manpower:
20
Location:
Secunda, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
12 Months / November 2018
SALTWATER PIT LOAD REDUCTION
Secunda, South Africa
Scope of Work:
- Detailed Electrical and Instrumentation engineering package
- Supply & Install:
- Lights
- Instruments
- Earthing system
- Cable racking and Cables
- DCS Software programming
Details:
Peak Manpower:
10
Location:
Secunda, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
2 Months / November 2018


SWITCHGEAR UPGRADE
Sasolburg, South Africa
Scope of Work:
- Replacement of old obsolete 525V switchgear
with DOL starters and static feeders - Design, procurement, installation and
commissioning of the following equipment:- 2x 525V MCC’s – 2x 110V DB’s
- UPS system – UPS DB
- 2x BTU’s – 4 DCS panels
- 3x LSP DB’s – Emergency feed ACO
- MCC integration into SCADA system
- Earthing and bonding of all equipment
- Cabling and racking replacement
Details:
Peak Manpower:
18
Location:
Sasolburg, South Africa
Contractor:
Lead Engineering and Projects
Duration / Finish:
4 Months / September 2018